Math Formulas: Time and Work

  1. Work from Days:
    If A can do a piece of work in n days, then A's 1 day's work = 1/n
  2. Days from Work:
    If A's 1 day's work = 1/n , then A can finish the work in n days.  
  3. Ratio:
    If A is thrice as good a workman as B, then:
    Ratio of work done by A and B = 3 : 1.
    Ratio of times taken by A and B to finish a work = 1 : 3.